- Oakton DO110 Handheld Dissolved Oxygen Meter
- SOP Accidental recirc Shutdown Procedure
- SOP Adjusting foam fractionator for optimal performance
- SOP Adjusting light timer
- SOP Backwashing Aquadyne micro bead filter
- SOP Cleaning screen filters
- SOP Checking the Low Head Oxygenator
- SOP Chiller trouble shooting
- SOP Cleaning pump filter baskets
- SOP Cleaning tanks
- SOP Cleaning the foam fractionator
- SOP Cleaning the Permabead filter
- SOP Controlling P1 and P2 pumps at VFD/PLC
- SOP Equipment Disinfection
- SOP Equipment disinfection with Virkon
- SOP Field equipment in the ZARF
- SOP Installing or replacing a P1 or P2 pump or motor for recirculation systems
- SOP ORP calibration
- SOP Oxyguard commander probe temperature calibration
- SOP Oxyguard DO probe maintenance
- SOP pH calibration recirculation systems
- SOP Pressure washer use 2024
- SOP Programming temperature with the Aqualogic heat exchange pumps
- SOP Recirculation System Cleaning and Disinfection 2026
- SOP Recirculation system- When P1 or P2 pump fails
- SOP Reprogramming Carbon Filter Head Units June 2026
- SOP Resetting ORP probe
- SOP Salinity probe calibration recirculation system
- SOP SC450 Colorimeter to detect free chlorine
- SOP Setting defrost termination temp for environmental chamber
- SOP Shut down procedures for the recirculation systems
- Post surgery fish monitoring template
- SOP 3 step-amphibian euthanasia - June 2026
- SOP Analgesia
- SOP Aquatic facility staff and fish mortality
- SOP Controlling waste in water Nitrogen Cycle
- SOP Cycling aquaria-fishless
- SOP Cycling aquaria-with fish filter
- SOP Daily aquatic animal monitoring.2
- SOP Daily aquatic animal monitoring
- SOP Disease treatment-fungal parasite
- SOP Disease treatment- Mallachite green
- SOP Disposal of uncontaminated fish waste
- SOP Egg disinfection
- SOP Egg treatment
- SOP Feeding rate
- SOP Fish euthanasia - June 2026
- SOP Fish feed storage
- SOP Fish welfare monitoring following surgery
- SOP Formaldehyde bath treatment
- SOP Habitat enrichment
- SOP Mass die off or steady death rate
- SOP Mortality collection and disposal
- SOP Water quality monitoring
- SOP What do to after a power outage has been restored
- Flowchart - Steps for Bringing Animals into InSEAS 2026
- Request for space form 2026
- Water Quality Guidelines and Water Quality Monitoring Plan 2026
- Species Specific Husbandry Form 2026
- Water Quality Monitoring Record Sheet 2026
- Fish Health Monitoring Record Sheet 2026
- Fish Health Monitoring Rubric and Body Condition Scoring 2026
- Monthly fish audit log 2026
- Quarantine & Biosecurity forms - 2026
- ACC Procurement Guideline 2022
- ACC Procurement Policy 2022
- Air Quality Monitoring Plan
- Disaster Plan INSEAS 2022
- General guidelines for shelving and storage in rooms with livestock
- INSEAS Basement tunnel orientation
- INSEAS Recirculation system orientation
- Seawater ordering from City of Vancouver
- SOP Aquatics facility access
- SOP Biomass Measurement of Fish 2026
- SOP Contacting UBC veterinarian
- SOP Daily monitoring of the Zoology Aquatics Research Facility
- SOP Fish Transport Within Building 2026
- SOP for Facility Staff and Researcher Responsibilities
- SOP for Reprogramming the PT4 SYNC water quality monitoring program on the computer
- SOP for Resetting Carbon Filter Head Units
- SOP for Setting up a new computer with PT4 SYNC program
- SOP Land Transport of Salmonids 2026
- SOP on Installing new program file for PT4SYNC
- SOP on Remote access for water quality monitoring program
- SOP Holiday facility check
- SOP SWAN chlorine analyzer Fill_Flush
- SOP SWAN chlorine analyzer reagent refill
- SOP Tank label
- ZARF Husbandry guide
- ZARF User guide